SPI
Ship&Offshore | Issue 06/2012

Problems during heavy-lift operations in DP mode

June 2012 | Stephan Müller, Walter Kuehnlein

OFFSHORE INSTALLATION During heavy-lift operations in dynamic positioning (DP) mode, some vessels have been observed to deviate significantly from their position. The following article by Stephan Müller from MarRes Maritime Research and Innovation and Dr Walter L. Kuehnlein, managing director of SEA2ICE, summarises this problem and is meant to serve as a basis for an open discussion.