Ship&Offshore | Ausgabe 06/2012
Installation of a BWTS on board a VLCC
INERT GAS There are many challenges when installing a ballast water treatment system (BWTS) on an existing vessel. In the following, Chris McMenemy, general manager at UK-based Cleanship Solutions Ltd (CSS), describes the process of retrofitting the VLCC Alfa Glory with a sophisticated inert-gas BWTS.